Enhanced Responsible Procurement Program (RPP) Implemented by National Flooring Association

The National Wood Flooring Association has made enhancements to its Responsible Procurement Program (RPP). This program is for wood flooring manufacturers who are committed to producing and promoting wood floors that come only from environmentally and socially responsible sources, improving forest sustainability for future generations.

“The NWFA’s research verifies what we have always suspected: homeowners view wood flooring as being the most environmentally responsible flooring available,” said Neil Poland, President of Mullican Flooring, an RPP participant. “These new program enhancements give Mullican a clear way to reinforce this message and communicate this unique attribute at the point of sale.”

A few key enhancements include:

  • A new “Verified from U.S. Renewing Forests” logo.
  • On-product use of the new logo is now permitted.
  • For RPP participants that have obtained FSC Chain-of-Custody (CoC) certification, NWFA has made a renewed commitment to help them set and reach benchmarking goals for certified flooring sales.
  • A simplified auditing process.

To learn more about these enhancements and to read the updated Program and Standard Documents, visit www.nwfa.org/rpp.aspx.

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition