California College of the Arts Breaks Ground on New On-Campus Student Housing

In February, California College of the Arts (CCA) broke ground on new student housing in San Francisco. Designed by leading architecture firm Stanley Saitowitz | Natoma Architects Inc., the five-story building will provide much-needed, below-market-rate housing for more than 500 students—roughly 25 percent of CCA’s student body—upon its completion in 2020. The 280 rooms are CCA’s first on-campus housing in San Francisco and are positioned at the center of the school’s expanding campus.

CCA Hooper Student Housing

The building will primarily provide housing to the school’s first- and second-year students. It will include single- and multiple-occupancy units and more than 12,000 square feet of common areas, along with social and study spaces. An inviting, sunlit café on the ground floor of the building will be surrounded by floor-to-ceiling glass windows.

At the ground level, the facility includes 10,000+ additional square feet of outdoor space with landscaped, interconnected courtyards. The building also features a 400-square-foot outdoor deck on the fifth floor. The sidewalk outside the building will expand to accommodate an increase in foot traffic and landscaping. Crosswalks will be added, giving the neighborhood a more residential feel.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition