VLK Architects and Royse City ISD Break Ground on Bobby Summers Middle School

On March 7, VLK Architects joined with Royse City ISD students, staff, administrators, and community members to celebrate breaking ground on the district’s new Bobby Summers Middle School.  The school’s namesake was also in attendance to commemorate this new campus. This facility is the largest project included in the district’s 2018 bond and will serve 1,200 middle school students in grades six through eight.

Royse City

“Through VLK|LAUNCH, a committee was formed to design this school that consisted of staff, parents, community members, and most importantly our students. The design is going to be safe, smart, modern, and efficient,” said Kevin Worthy, Superintendent, Royse City ISD. “From the secure interior courtyard, to the community friendly extracurricular facilities, we hope that it will spark creativity and passion for learning in every child.”

The new building is designed to promote outdoor engagement with a centrally located secure courtyard and large windows allowing day light throughout. The multipurpose courtyard area located just outside of the cafeteria functions as a staging area and will further serve as a meeting space for large events, classes, and play space. Multipurpose furniture will be placed on tracks that can be moved based on the space needed. The design is specified to be environmentally friendly by using a rainwater collection tank to further aid in landscaping.

Bobby Summers Middle School is expected to open its doors to students in August 2020.

Featured

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Universities Continue to Launch Multimillion-Dollar Campus Transformations

    What makes the current wave of campus development especially noteworthy is its emphasis on multi-use functionality and community integration. Institutions are no longer investing solely in academic or athletic facilities in isolation. Instead, they are creating destinations that blend recreation, health, housing, and event-driven economic activity.