University of Pennsylvania Reveals Plans for New Facility

PHILADELPHIA, PA – The University of Pennsylvania (Penn) has released architectural renderings of the design for the transformative Tangen Hall. The new building will be Penn’s first dedicated space for cross-campus student entrepreneurship and innovation activity.

University of Pennsylvania Tangen Hall

Developed by the Hankin Group, KSS Architects’ design for Tangen Hall sets up each floor with a destination program. A façade of precast concrete and shades of green glass will offer a transparent view into the innovation culture at Penn. The project uses sustainable materials and is designed to meet Penn’s LEED Silver target.

Supporting student entrepreneurship and innovation, the seven-story, 68,000-square-foot building will be one of the largest hubs of its kind on any college campus. It will include incubator spaces and maker spaces to pilot student-led ventures, a test kitchen for food-centric startups, and the master’s level Integrated Product Design Program jointly operated by Wharton, the School of Engineering and Applied Science, and the Stuart Weitzman School of Design. Tangen Hall will also be home to the new Venture Lab, where students from across Penn’s 12 schools can turn good ideas into great outcomes.

Construction of Tangen Hall is slated to begin in spring 2019 and be completed by fall 2020.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.