UC Santa Cruz Student Housing West to Ease Housing Crunch

SANTA CRUZ, CA – The University of California Board of Regents recently approved critical new student housing projects at the UC Santa Cruz (UCSC) campus. The project, Student Housing West, is being led by national developer Capstone Development Partners, and will create more than 3,000 new student beds on campus at two sites: the Hagar Site, located near the southeast corner of the main campus and the Heller Site, located on the western side of the main campus. The project will also include a new Early Education Center serving 140 children of UCSC's students, faculty, and staff.

UC Santa Cruz Housing

Lead architect, HED, is responsible for design at the Heller Site, of approximately 800,000 square feet of undergraduate student housing across five buildings, along with a community plaza hub that includes cafe, market, and wellness amenities. HED is working with design-build contractor, DPR Construction. Walker Macy is serving as the project's lead campus planner and landscape architect for both sites. Additional design architects include Mithun and Katerra for the Graduate Student Housing building at the Heller Site. The Hagar Site design team includes Katerra for Family Student Housing and the Community Building, and SABArchitects for the Early Education Center with design-build contractor, Swinerton. Overall project cost is estimated at $713 million.

The Graduate Student Housing and Undergraduate Student Housing are a blend of apartment-style units and co-living models with shared common areas and kitchens. These were designed to achieve affordable rental rates—a key concern among students surveyed—and panelized components are expected to be fabricated off site and assembled on site.

Both project sites are being designed to achieve a high level of sustainability, including focused efforts to decrease use of non-potable water (through a dedicated wastewater treatment plant on each site) and decrease the generation of carbon and waste. In addition, the development team is striving to achieve LEED Platinum certification for both sites.

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

Digital Edition