Tackle High Dusting With a Vacuum

People tend to notice the cleanliness of surfaces immediately around them like desks, floors, and shelves. They don’t necessarily look up and consider the cleanliness of light fixtures, windowsills, and overhead air ducts. Janitorial professionals know that dust in high places can end up falling onto surfaces where people work, play, and eat. This particulate may become airborne and is easily inhaled into the lungs.

That’s where high dusting tools really change the conversation. Adding extension wands to a vacuum can add 10 to 12 feet of reach, bringing many surfaces within reach. Unless completely ignored, the traditional approach to cleaning high places is either with a ladder and some sort of dusting tool or the utilization of a scissor lift. High dusting tools allow janitors to vacuum these areas with two feet safely on the ground.

Putting someone on a ladder to clean is a potential health and safety hazard. It is the employer’s responsibility to take every reasonable precaution and train janitors on the proper use of a ladder to ensure they are used correctly, thus reducing the risk of serious injury from a fall. With the right high dusting tools added to a vacuum, this risk is mitigated as anyone can clean with both feet safely on the ground.

There’s so much more to vacuum than just floors—be they carpeted or hard surface. By pairing high dusting tools with a vacuum, it can be safer, easier, and more convenient to clean just about anywhere.

This article originally appeared in the College Planning & Management July/August 2019 issue of Spaces4Learning.

About the Author

Marvin Mauer is the Canadian country manager for ProTeam® (proteam.emerson.com/en-us).

Featured

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.

  • Washington State University Debuts New Engineering Hall

    Washington State University recently celebrated a dedication ceremony for the new Schweitzer Engineering Hall on its Pullman campus in Pullman, Wash., according to university news. The facility measures 66,288 square feet, and its completion marks the first milestone in a larger university effort to modernize the engineering and design district.

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.