MI Districts Add Vinyl to Windows for Security and Cooling

Two school systems in Michigan are turning to window-sized graphics for safety, security and environmental benefit. Addison Community Schools and Hudson Area Schools have both turned to sign company Insignia Graphics to design, produce and install perforated vinyl on windows in their buildings.

According to local reporting, the window coverings help to keep rooms cooler on warm days by limiting the amount of sunlight that comes in while also providing a level of security. As Hudson Superintendent Michael Osborne told a reporter, the vinyl "enables staff and students to see outside but not people from the outside to be able to see in the classrooms." He added that the vinyl also adds strength to the glass.

The Hudson installation was part of a $141,000 safety grant the district received from the state through the Competitive School Safety Grant Program.

The funding has enabled the districts to customize the vinyl with school colors and logos. The Hudson grant was also expected to cover upgrades to entrances for the district's three buildings, including protective screens on all exterior doors, creation of a breezeway at the elementary entrance and bulletproof glass for the receptionist at both the elementary and middle school/high school main entrances.

The complete list of recipients is available on the Michigan State Police website.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Spaces4Learning Launches 2025 New Product Awards

    Spaces4Learning is now accepting entries for the 2025 New Product Awards! The program’s goal is to honor the outstanding product development achievements of manufacturers and suppliers whose products and services are particularly noteworthy in helping to improve K–12 and Higher Education learning environments.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

Digital Edition