Wisconsin’s New Berlin First Participant in Solar Now Pilot

Wisconsin’s School District of New Berlin is outfitting three of its schools this summer with solar panels. The project, with WE Energies and SunVest Solar, will install 8,076 panels at three schools this summer. The installations will primarily go on rooftops, but one school will also have a solar field with 2,134 modules. The installation, part of WE's new "Solar Now" program, will create 35 megawatts of renewable energy.

The system includes access to SolarEdge, which provides online monitoring of energy production and usage data.

Solar Now is a pilot program approved by the state's Public Service Commission. In discussion before the vote, solar advocates told commissioners that the program gives WE Energies a monopoly on solar implementations within the state. The program works like this: The company installs solar panels on customer properties, and the customer receives a monthly lease payment based in part on how much power the panels generate. According to regional reporting, this "rent-a-roof" model prevents customers from being able "to lease or finance equipment through private developers," which cuts those companies out of the business.

The project, with WE Energies and SunVest Solar, will install 8,076 panels at three schools this summer. The installations will primarily go on rooftops, but one school will also have a solar field with 2,134 modules.
Image source: WE Energies

In a presentation to the school district, WE estimated the rent payments for the four solar installations at $94,401 per year, totaling $1.89 million for the 20 years of the agreement. In the arrangement, the school district would be responsible for the cost of temporarily relocating the solar array if the various school roofs were to need replacement.

"We are proud to be the first participant in this innovative renewable energy program," said Superintendent Joe Garza, during the project announcement. He noted that along with adoption of renewable energy, the initiative will also give students "the unique opportunity to gain real life knowledge about the production of solar energy for years to come."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition