Florida State is Building a New Student Union

TALLAHASSEE, FL – Florida State University (FSU) is moving ahead with an ambitious plan to take down Oglesby Union and build a new one that incorporates FSU tradition, while elevating the look and feel of the entire campus. The new four-story Oglesby Union will feature a visionary style, including sleek glass walls, comfortable outdoor seating, state-of-the-art technology, and many of the venues students have grown to know and love. A bigger and better FSU Campus Bookstore will feature prominently in the facility, along with new ballrooms, study and leisure areas, spaces for meetings and student groups, and new food venues.

Florida State University Student Union

“It’s going to be transformative,” says Oglesby Union director Matt Ducatt, who has been collaborating with a team of design and construction experts. “It’s going to be a great facility for our campus and students.”

The new Oglesby Union will be larger than the previous facility, including nearly 300,000 square feet of space, and introduce a lively new sports-themed restaurant, as well as a half dozen new food operations. Ducatt said the redesigned union will be laid out with a smarter, more efficient design, making it easier to get around and enjoy outdoor amenities.

The design was developed by a partnership between Architects Lewis+Whitlock of Tallahassee and Workshop Architects of Milwaukee. The team has extensive experience with university construction projects. Construction will be led by the Ajax Building Corporation.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition