Sartell SD Designs New High School With Career Options in Mind

After voters approved a bond in 2016 and after years of planning and design, Minnesota’s Sartell High School will open on Sept. 3. The nearly $90 million project features open common spaces, classrooms with floor-to-ceiling windows, small-group and large-group work spaces, as well as dedicated labs to create digital media projects.

After voters approved a bond in 2016 and after years of planning and design, Minnesota’s Sartell High School will open on Sept. 3. The nearly $90 million project features open common spaces, classrooms with floor-to-ceiling windows, small-group and large-group work spaces, as well as dedicated labs to create digital media projects.

The new building design places a focus on helping students prepare for a variety of options after they graduate including joining the workforce, following a two-year post-secondary path and attending a four-year college. Spaces for welding and fabrication, a wood shop, an automotive shop and a professional-grade kitchen for culinary arts can be found in the building. A coffee shop and school store in the commons area will give students opportunities to manage a business. A lab will be used in partnership with a local clinic, St. Cloud Orthopedics, where students can learn from medical professionals.

“We need to prepare kids to multi-task,” Sartell-St. Stephan ISD Superintendent Jeff Schwiebert told a local newspaper. “Their careers will not be the same day in and day out. They will work in teams. Our challenge is to make sure we have the space and our curriculum and methods meet those changes.”

The new high school was designed by Cuningham Group in collaboration with IIW-Minnesota. Students and teachers’ input of how they use the school space was incorporated into the design.

Three Learning Neighborhoods house visible, flexible and adaptable learning spaces. Each has a variety of large-group rooms, informal gathering spaces, small-group rooms and space for individual work.

More highlights from the new building include:

  • The Commons, a two-story space with bright colors, tables and comfortable chairs and couches with second-floor windows. Eight science labs overlook the Commons and windows open to the technical education and arts classrooms.
  • Three Learning Neighborhoods house visible, flexible and adaptable learning spaces. Each has a variety of large-group rooms, informal gathering spaces, small-group rooms and space for individual work.
  • A main gym that seats 2,000 people with two giant video screens. An eight-lane swimming pool with an expanded deck for teams and 400 spectator seats. Multiple practice fields and tennis courts on more than 60 acres of green space.

Tours of the new school will be open to the public on Sept. 14th during their Grand Opening & Community Open House event.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.

  • NWEA Report Recommends K–12 Natural Disaster Recovery Strategies

    The Northwest Evaluation Association (NWEA), a K–12 assessment and research organization, recently announced the release of a new playbook for schools and communities recovering from extreme weather events, according to a news release.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.