Pennsylvania SD Adds Bullet-Resistant Glass to New School Plans

The Wilkes-Barre Area School District approved an upgrade to safety measures for a new high school still under construction. The school board voted to add bullet-resistant glass along the building’s perimeter and in the school’s entryway. The glass adds a $460,000 cost to the project and will be installed by Sterling Glass.

"Unfortunately, this — school shootings, and active shootings, shooters — [is] something we have to contend with and deal with, and this is a measure we can take to try to make those kids as safe as possible," Shawn Walker, vice president of the Wilkes-Barre Area School Board, told a local news reporter.

The total budget for the project is $121 million and includes $7 million for contingent expenses. The new school will combine the district’s three high schools into one.

Construction for the new high school began earlier this year and is expected to be completed in 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • nursing students talk while studying in a hallway

    Elsevier Launches VR Simulation Solution for Nursing Students

    Elsevier has introduced Shadow Health Lab with Virtual Reality, a simulation platform that allows nursing students to interact with virtual patients and build clinical judgment skills in a safe, realistic environment.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.