Net-Zero Middle School to Be Built Outside of Houston

A new middle school, just outside of Houston, will have a net zero design, meaning the building will produce as much energy as it consumes. Corgan, the architecture firm that designed the school, presented the latest schematics at a Fort Bend ISD school board meeting on Sept. 16.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs.

The new middle school located in Missouri City will include about 90,000 square feet of solar panels on the roof and overhangs. The energy produced by the solar panels will be converted on-site and sent to the power company who will give the school credit for the power it produces, reported Community Impact Newspaper.  

“We are going to achieve net zero by using renewable energy resources and an enhanced building envelope that will reduce the heating and cooling load on this building,” said AJ Sustaita, an education architecture project manager at Corgan.

The 2018 FBISD bond election included funds for the new middle school. The school district approved Corgan to prepare design and construction documents for the school in December. The proposed project budget is more than $10 million.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Image courtesy of Kahler Slater

    UW–Madison Announces Completion of Morgridge Hall

    The University of Wisconsin–Madison recently announced that construction is complete on Morgridge Hall, a new academic building, according to a news release. The facility opened September 3 at the start of the fall semester, consolidating the School of Computer, Data & Information Sciences into a single facility for the first time.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.