Mobile Fab Lab Brings "STEAM Education on the Go"

Bucks County Intermediate Unit in Pennsylvania debuted a new mobile fab lab that brings “STEAM education on the go.”

The mobile fab lab is a van equipped with the latest in science technology that will prepare students for the workforce. The lab’s first stop is at Seylar Elementary School where it will stay for a week and then move on to other elementary and middle schools in all 13 county school districts for week-long residencies.

Bucks County Intermediate Unit in Pennsylvania debuted a new mobile fab lab that brings “STEAM education on the go.”

The equipment is unloaded and placed in a cafeteria or gym for students and teachers to use. A designated specialist is assigned to the van and tailors age-appropriate curricula for each school utilizing the equipment.

Students can look forward to working with:

  • Two 3-D printers;
  • A silhouette portrait fabricator;
  • A vinyl cutter;
  • A computer numerical controller router;
  • A laser cutter; and
  • Various robotics equipment.

“The Mobile Fab Lab will support innovative teaching and learning in schools throughout all of Bucks County,” Bucks County IU Executive Director Mark Hoffman told a local newspaper. “Having a van that can move between schools allows the districts to bring cutting-edge, modern equipment directly to the students and their teachers. This helps to ensure that Bucks County schools are preparing young people today for the jobs they’ll hold tomorrow.”

The van was purchased and equipped using a $412,000 PAsmart grant from the state’s Department of Education.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

Digital Edition