Sustainable New Library Opens at Temple University

PHILADELPHIA, PA – A project more than 10 years in the making, the new $135-million Charles Library at Temple University is now open to students. The 220,000 square foot building anticipates over 5 million annual visitors. The building replaces the existing 1960s facility, an outdated building that no longer met the needs of a modern and growing student population.

The building’s base is covered in granite and appears different in color depending on the time of day, creating an evocative mood. Glass is strategically positioned at the three entrances to allow in the natural light and foster a sense of transparency. Visitors are immediately greeted by the expansive three-story atrium lobby that offers views of every floor and corner of the building. Light fills the space from an oculus on the uppermost floor, shining down the cedar-clad dome. A steel main staircase is situated near the information desk.

Temple University Library

As part of a $1.2 billion capital improvement program for its Main Campus in North Philadelphia, Temple University commissioned Stantec, as part of a joint venture with Snøhetta, to design the new library. As part of its role as co-designer, Stantec’s responsibilities include architectural documentation, sustainability, project management, and MEP/FP engineering services.

As sustainability lead and LEED consultant, Stantec also designed the building’s green roof, the second largest in the city of Philadelphia. The roof is integrated into the building’s stormwater management system, which is designed to capture rainwater from the campus and manage all rainwater runoff, keeping it from burdening Philadelphia’s aging infrastructure. The building is targeting LEED Gold certification.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.