New Construction for Growing Mountain View Student Population

Mountain View High School and Los Altos High School celebrated the start of construction of new classroom buildings with a groundbreaking ceremony. The new construction, funded by a $295-million bond measure passed last year, will accommodate the California district’s rapidly growing student population. The buildings were designed by Quattrocchi Kwok Architects (QKA) and will be built by RGM Kramer Inc.

Mountain View High School

MVHS will add two new buildings totaling in 42,000 square-feet of new construction. The new two-story main classroom building will feature:

  • Four life-skills labs for Special Education students;
  • Expandable classrooms with movable walls;
  • Writable wall surfaces;
  • Small group break-out rooms; and a
  • Staff collaboration lounge.

A new single-story building will be for STEM classrooms including: two computer science classrooms, an engineering lab with 3D printing capabilities, a robotics lab and an electronics prototyping lab.

Los Altos High School

LAHS will gain a new auxiliary gymnasium and 23 new classrooms.

The general classroom building will include: a culinary arts classroom, several flexible learning spaces and a teacher collaboration room. A new lab building will include spaces for 3D printing, laser cutting, and an advanced computer lab.

Both campuses will pursue LEED-Silver certification and are designed to meet Collaborative for High Performance Schools (CHPS) standards.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • ZeroEyes, Academic Innovators Partner to Provide Safety Solutions

    ZeroEyes, which produces a multi-analytics weapons detection and threat intelligence platform, recently announced a partnership with Academic Innovators, according to a news release.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Homewood-Flossmoor High School NetZero Addition

    Homewood-Flossmoor High School NetZero Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Homewood-Flossmoor High School NetZero Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.