New Construction for Growing Mountain View Student Population

Mountain View High School and Los Altos High School celebrated the start of construction of new classroom buildings with a groundbreaking ceremony. The new construction, funded by a $295-million bond measure passed last year, will accommodate the California district’s rapidly growing student population. The buildings were designed by Quattrocchi Kwok Architects (QKA) and will be built by RGM Kramer Inc.

Mountain View High School

MVHS will add two new buildings totaling in 42,000 square-feet of new construction. The new two-story main classroom building will feature:

  • Four life-skills labs for Special Education students;
  • Expandable classrooms with movable walls;
  • Writable wall surfaces;
  • Small group break-out rooms; and a
  • Staff collaboration lounge.

A new single-story building will be for STEM classrooms including: two computer science classrooms, an engineering lab with 3D printing capabilities, a robotics lab and an electronics prototyping lab.

Los Altos High School

LAHS will gain a new auxiliary gymnasium and 23 new classrooms.

The general classroom building will include: a culinary arts classroom, several flexible learning spaces and a teacher collaboration room. A new lab building will include spaces for 3D printing, laser cutting, and an advanced computer lab.

Both campuses will pursue LEED-Silver certification and are designed to meet Collaborative for High Performance Schools (CHPS) standards.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.