New Construction for Growing Mountain View Student Population

Mountain View High School and Los Altos High School celebrated the start of construction of new classroom buildings with a groundbreaking ceremony. The new construction, funded by a $295-million bond measure passed last year, will accommodate the California district’s rapidly growing student population. The buildings were designed by Quattrocchi Kwok Architects (QKA) and will be built by RGM Kramer Inc.

Mountain View High School

MVHS will add two new buildings totaling in 42,000 square-feet of new construction. The new two-story main classroom building will feature:

  • Four life-skills labs for Special Education students;
  • Expandable classrooms with movable walls;
  • Writable wall surfaces;
  • Small group break-out rooms; and a
  • Staff collaboration lounge.

A new single-story building will be for STEM classrooms including: two computer science classrooms, an engineering lab with 3D printing capabilities, a robotics lab and an electronics prototyping lab.

Los Altos High School

LAHS will gain a new auxiliary gymnasium and 23 new classrooms.

The general classroom building will include: a culinary arts classroom, several flexible learning spaces and a teacher collaboration room. A new lab building will include spaces for 3D printing, laser cutting, and an advanced computer lab.

Both campuses will pursue LEED-Silver certification and are designed to meet Collaborative for High Performance Schools (CHPS) standards.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Auburn University Debuts $224M STEM + Agricultural Sciences Complex

    Auburn University in Auburn, Ala., recently opened its new $224-million STEM + Agricultural Sciences Complex, the largest research construction project in the university’s history, according to university news. The facility measures more than 265,000 square feet and brings six departments from the College of Agriculture and College of Sciences and Mathematics together under one roof.

  • ZeroEyes, Academic Innovators Partner to Provide Safety Solutions

    ZeroEyes, which produces a multi-analytics weapons detection and threat intelligence platform, recently announced a partnership with Academic Innovators, according to a news release.