New Missouri Elementary Features Collaborative Spaces for Each Grade Level

Renderings and floor plans of a new elementary school were shared in the last Washington School District board meeting. The new, two-story elementary school will replace South Point Elementary and is funded by Prop S, a $26 million bond issue approved in April.

Bond Architects and Washington Engineering gave a presentation to board members on the project. The 78,000-square-foot building will be “angular with both rustic and industrial flair inside and out featuring a dynamic color scheme,” Superintendent Dr. Lori VanLeer, told a local newspaper. The school will feature collaborative spaces for each grade level with books available to check out in each space in addition to a library/makerspace with space for full class instruction and room to build projects.

Classrooms for kindergarten through second grade will be on the first floor with third through sixth grade on the second level. The gym, located on the main floor in the center of the building, will also be a storm shelter with adjacent bathrooms and a backup generator.

Construction bids will go out in early January and a contract will be awarded in late January or early February with construction beginning in the spring of 2020.

The new school is estimated to cost $23 to $24 million and slated to open in August 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • University of Utah Launches Utah 360 App

    The University of Utah in Salt Lake City, Utah, recently announced that it has partnered with digital engagement hub Pathify to launch a new app for the university community, according to a news release.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

Digital Edition