New Missouri Elementary Features Collaborative Spaces for Each Grade Level

Renderings and floor plans of a new elementary school were shared in the last Washington School District board meeting. The new, two-story elementary school will replace South Point Elementary and is funded by Prop S, a $26 million bond issue approved in April.

Bond Architects and Washington Engineering gave a presentation to board members on the project. The 78,000-square-foot building will be “angular with both rustic and industrial flair inside and out featuring a dynamic color scheme,” Superintendent Dr. Lori VanLeer, told a local newspaper. The school will feature collaborative spaces for each grade level with books available to check out in each space in addition to a library/makerspace with space for full class instruction and room to build projects.

Classrooms for kindergarten through second grade will be on the first floor with third through sixth grade on the second level. The gym, located on the main floor in the center of the building, will also be a storm shelter with adjacent bathrooms and a backup generator.

Construction bids will go out in early January and a contract will be awarded in late January or early February with construction beginning in the spring of 2020.

The new school is estimated to cost $23 to $24 million and slated to open in August 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.