New Missouri Elementary Features Collaborative Spaces for Each Grade Level

Renderings and floor plans of a new elementary school were shared in the last Washington School District board meeting. The new, two-story elementary school will replace South Point Elementary and is funded by Prop S, a $26 million bond issue approved in April.

Bond Architects and Washington Engineering gave a presentation to board members on the project. The 78,000-square-foot building will be “angular with both rustic and industrial flair inside and out featuring a dynamic color scheme,” Superintendent Dr. Lori VanLeer, told a local newspaper. The school will feature collaborative spaces for each grade level with books available to check out in each space in addition to a library/makerspace with space for full class instruction and room to build projects.

Classrooms for kindergarten through second grade will be on the first floor with third through sixth grade on the second level. The gym, located on the main floor in the center of the building, will also be a storm shelter with adjacent bathrooms and a backup generator.

Construction bids will go out in early January and a contract will be awarded in late January or early February with construction beginning in the spring of 2020.

The new school is estimated to cost $23 to $24 million and slated to open in August 2021.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.