University of Maine Receives $1M Pledge From Pratt & Whitney for Engineering Center

ORONO, ME – A $1-million pledge from Pratt & Whitney for the E. James and Eileen P. Ferland Engineering Education and Design Center (Ferland EEDC) was announced in late October as part of University of Maine (UMaine) Homecoming Weekend by College of Engineering Dean Dana Humphrey and University of Maine Foundation President Jeff Mills.

Pratt & Whitney will name the center’s Machine Tool Suite, featuring more functional, updated space for mechanical engineering technology students to develop production and manufacturing skills. It will feature open workspace, computer-controlled milling machines and lathes, a tool crib, an applied research lab, and a computer-aided drafting/computer-aided manufacturing classroom.

“This gift will allow our mechanical engineering technology students to gain the hands-on experience that they need to be effective from day one in their careers. It is so appropriate that Pratt & Whitney named this space since they hire so many of our engineering graduates. I am deeply grateful for the strong and long-standing relationship between UMaine engineering and Pratt & Whitney,” says Dana Humphrey, dean of the College of Engineering.

Pratt & Whitney’s previous support for UMaine Engineering includes a $100,000 gift in 2015, which provided scholarships and equipment for UMaine’s MET program.

“UMaine has a 99 percent placement rate for engineering graduates in careers or graduate school,” says UMaine President Joan Ferrini-Mundy. “As a corporate leader in engineering, Pratt & Whitney understands the value of career-ready engineers. This gift moves our project forward, and supports our goals of fostering learner success and bringing research into the classroom. We are deeply appreciative of Pratt & Whitney’s vision and support of the future of engineering education in Maine.”

Ferland EEDC is the highest capital priority for UMaine’s Vision for Tomorrow Campaign, led by the University of Maine Foundation. This pledge brings the total amount raised in support of the new facility to over $67 million, which includes over 400 gifts from alumni, friends, foundations, corporations, and UMaine employees; $50 million invested by the state of Maine; principal gifts of $10 million from James Ferland ’64 and Eileen Ferland, $1.5 million from the Gustavus and Louise Pfeiffer Research Foundation; $1 million from the Abbagadassett Foundation; and $1 million from the Packaging Corporation of America.

The expected cost is $75 million to $77 million. Groundbreaking for the center is planned in spring 2020, with anticipated completion in 2022.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition