Orange Coast College Language Arts and Social Science Building Breaks Ground

COSTA MESA, CA – A recent groundbreaking took place for Orange Coast College’s (OCC) new $50-million Language Arts and Social Science Building. The three-story, 107,760-square-foot building is part of a larger initiative to modernize the campus and accommodate its rapidly expanding enrollment. It is expected to be complete in summer 2021.

Orange Coast College Language Arts Building

The Language Arts and Social Science Building’s first floor will house classrooms, labs, an English as a Second Language (ESL) computer lab and room, facilities for the Speech, Debate and Theater Team and a journalism newsroom. The second floor will be comprised of classrooms and connect to the existing Mathematics Business and Computer Center Building, while the third floor will encompass division and faculty offices. The building also will feature two elevators, a lactation room and gender-neutral restrooms on every floor.

The building is financed through a combination of funding from California Proposition 51 and Measure M, a $698-million general obligation bond provided to construct education facilities for Coast Community College District.

C.W. Driver is partnering with tBP Architecture on the project.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition