Renovation Complete on Macalester College’s Janet Wallace Fine Arts Center

MINNEAPOLIS, MN – A long-term renovation of Macalester College’s Janet Wallace Fine Arts Center (JWFAC) in St. Paul, MN, is now complete. Placing the values of a liberal arts education at the forefront of its master planning process, HGA, a national multi-disciplinary design firm, completed the last phase housing the Theater and Dance department in the spring of 2019. The Arts Center is part of a wider educational movement across campuses today, in which arts facilities help shape social change and inspire students.

Macalester’s new Theater and Dance department is located in the center of its beautiful urban campus. HGA revitalized the facility’s connectivity within departments and to the campus itself, ushering in a new wave of creativity and collaboration for students and faculty.

Macalaster College Fine Arts Center

Photo © Corey Gaffer Photography

The JWFAC is designed with an outward expression that integrates the three phases (music, visual arts, theater and dance), giving each a distinct yet unified identity. Each phase includes a featured façade with custom architectural expression related to the arts discipline within. The entry of the Theater and Dance building, for instance, features a flowing, perforated, custom-metal scrim façade that is internally lit, alluding to the movement, fabric, and theatricality of the performing arts.

The finale of this three-phase, four building project included demolishing the original 1965 Theater and Dance wing, and replacing it with a new three-level building. To foster interdisciplinary collaboration, the new plan takes advantage of adjacencies to existing resources within the complex, including the Mairs Concert Hall, the Law Warschaw Gallery and the Lowe Dayton Arts Commons.

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

Digital Edition