University of Pittsburgh at Bradford Residence Hall Earns LEED Silver Certification

BRADFORD, PA –The University of Pittsburgh at Bradford’s newest residence hall, the $17-million, 170-bed Livingston Alexander House, has earned LEED Silver certification from the U.S. Green Building Council. It is the first building on the campus to achieve LEED certification.

LEED (Leadership in Energy and Environmental Design) is green building certification that takes into account sustainability considerations that include green construction practices, water and energy efficiency, and more.

“It’s about caring for the environment,” says Rick Esch, vice president of business affairs, about the campus’s latest new facility meeting LEED standards. “Climate change is real. When you build sustainable buildings, it benefits the environment, the health of residents and the health of those constructing and making the materials that go into a LEED-certified building.”

Alexander House, which was completed and dedicated in 2018, was constructed from concrete and lumber from forests certified in sustainable forestry practices. The freshman-only hall is a three-story building wherein residents live in two-person bedrooms within a section of 24-36 students. This arrangement enables each section to have its own special programming and give students opportunities to learn outside the classroom.

High-efficiency heating, ventilating and air conditioning as well as thermal glass and insulation reduce the building’s energy consumption by 30 percent over standard construction. Additionally, the power supplied to Alexander House comes from renewable resources. Paint and carpets used inside the building emit a low level of organic compounds, as do the furnishings made from recycled materials. Even the cleaning supplies used in the residence hall must meet strict standards.

Occupied since the fall of 2018, the building has bike storage for students and parking places for electric vehicles. Plumbing fixtures in the building consume less water.

The construction process created as little waste as possible. The demanding standards of LEED required that even the waste headed to the landfill be measured. Anything that could be recycled was sorted for recycling.

“Between 10 percent and 100 percent of the materials used in all of the furniture is from recycled materials or can be recycled,” says Rhett Kennedy, director of auxiliary services.

Esch said the university’s goal is to achieve LEED status for all new construction on the campus, including a planned academic building to house the new engineering technology and energy engineering technology programs.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition