Expansion and Renovation Completed at Byron Nelson HS in North Texas

An expansion and renovation of Byron Nelson High School in Trophy Club, Texas was recently completed. The three-story, 75,000 square-foot expansion and renovation of the campus provides added capacity to a rapidly growing population in the Northwest Independent School District. The project was headed by Perkins & Will.

Byron Nelson High School. Courtesy of Perkins and Will.

The design emphasizes ‘learning on display’ with visibility to programs such as the school’s new Engineering Lab, a combination robotics and shop space; the Architecture Studio, which serves as a model making area; and the Biomedical Science program. The course areas are located near main hallways with glass walls to offer direct views inside so students, parents and visitors can observe classes.

Byron Nelson High School. Courtesy of Perkins and Will.

In addition, the Culinary Arts program was expanded and moved near the school’s bistro, which allows students to receive practicum experience, showcase their skills, and provide a service to students, staff and community.

Byron Nelson High School. Courtesy of Perkins and Will.

The expansion and renovation includes:

  • Collaboration areas to encourage one-on-one and small-group learning sessions.
  • All classrooms and labs have windows for natural light and views.
  • A reconfigured lobby to provide a secure entrance.
  • Renovated orchestra and band halls.
  • Renovated athletic locker and shower facilities.
  • Added athletic support spaces including PE lockers and restrooms, laundry facilities, a conference room, athletic offices.
  • A monumental staircase overlooking an outdoor space.

Hallway messaging and graphics showcase the school’s values, mascot, history, and the story of professional golfer and namesake Byron Nelson.

Perkins and Will took steps to make the project, collaborative, and environmentally friendly, according to a design brief. “Other sustainable steps taken include the school’s flooring, a no-wax solution of Forbo linoleum, which is bio-based and biodegradable, made with renewable and recycled ingredients, has CO2-neutral production, is naturally antimicrobial, and wax-free,” the design brief continues. “Non-VOC paint was also specified, as well as energy-friendly lighting, and high-efficiency HVAC systems were designed for this project.”

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.