U Central MO Gets "Living Room" Makeover

The University of Central Missouri has gone public with an update on a multi-year masterplan for renovating the Elliott Student Union, dubbed as the "campus living room," by the university's community. The student union is a 165,000 square-foot social hub that includes study areas, meeting spaces, student service offices, retail dining, a movie theater, a bowling center, a campus card center, bank and information desk.

The new entrance for the University of Central Missouri's student union includes seating, a graphic timeline and a digital wayfinding kiosk. Source: KWK Architects

After the 15-to-20-year masterplan was completed, the architects provided projections on expected costs for each phase of the renovation project. The goal was to update the central atrium as the primary student area, convert underused spaces, support the evolution of student services and improve the overall visitor experience.

Phase 1 of the plan encompassed a $7 million redesign that includes a new main entrance, finished in fall 2019, and the addition of a 280-seat multi-purpose auditorium, done in spring 2020. Besides making access to the whole of the facility more obvious, the new entrance was also designed to incorporate seating, a graphic wall timeline, entry signage and a digital wayfinding kiosk.

The new 5,700-square-foot auditorium has a stage and retractable seating, and entry into the space was made available through the new entrance hallway.

Design services were provided by higher-education-focused KWK Architects working with solution design firm CannonDesign. Renovations were handled by Missouri-based Westport Construction Co.

"The team analyzed existing conditions and held multiple workshops, meetings and a town hall to gain stakeholder input," said KWK Principal Eric Neuner, in a statement. "We explored various design options to best meet the university's vision for how the facility would look and feel and how its space would best be utilized."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.