California School District to Install Charging Stations

The Porterville Unified School District (PUSD), located in Tulare County, California, recently placed an order for six new electric school buses. During its Board of Education meeting on Jan. 28, the district also approved plans to install six new electric charging stations.

Set to be ready by August, the ABB Terra 54 fast charging stations will be placed at a bus yard near Porterville High School. The product’s website boasts that the average charging time for a vehicle runs between 15 and 30 minutes. The district is partnering with Southern California Edison (SCE) for the installation process.

School bus

PUSD officials have expressed that their longer-term goal is to transition the entire school bus fleet to electric models. Plans are already in the works to order four more electric buses during the next decade. The move is part of a larger PUSD initiative to reduce its power costs and utility bills by taking advantage of renewable energy sources and solar panels.

According to PUSD public information officer Jason Pommier, “That’s definitely one of the things we want to do, similar to the city, reducing the carbon footprint and moving away from some of the diesel buses. We’re always looking at ways where we can reduce costs, save money and utilize it for the students.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.