Texas High School Completes Campus Expansion Project

Lake Highlands High School, located in Richardson, Texas, announced this week that it has completed a campus expansion and renovation project. The work was done by Cadence McShane Construction and includes updates to multiple school facilities.

In a press release, Cadence McShane Construction listed the work that has been finished, including:

  • A 144,000-square-foot addition connecting the freshman center with the rest of the high school, including an expanded cafeteria, kitchen, common space and library.
  • A multipurpose activity center with a 78,000-square-foot practice facility (including an 80-yard practice field) and a 24,000-square-foot addition for offices, locker rooms, and support areas.
  • New general classrooms, science classrooms, ART Labs, and SPED classrooms repurposed from the former cafeteria and library spaces.
  • A two-story ICF storm shelter that also acts as a weight room, wrestling room, and locker room.

The project, designed by HKS, found its funding from a bond approved by voters in 2016. That bond allowed for $107 million in capacity, construction and renovation projects across the entire Richardson Independent School District (RISD) and $114 million in sports-related improvements, additions, and enhancements.

“Having the opportunity to renovate Lake Highlands High School and be able to give them the facilities that thye need to grow was exciting,” said Will Hodges, Cadence McShane Construction president. “We are proud to have had the opportunity to foster our relationship further with RISD and HKS on this project.”

Cadence McShane and RISD have partnered on 19 separate projects in the last 20 years.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.