Rapid Dx Laboratory, Ginkgo Bioworks Partner to Offer Pooled COVID Testing

Rapid Dx Laboratory has announced a partnership with Concentric by Ginkgo to provide pooled COVID-19 testing to K–12 schools in both in-person and hybrid learning environments.

Rapid Dx Laboratory, a molecular diagnostics laboratory based in Houston, Texas, offers an average 12–16-hour turnaround for test results on thousands of samples per day. The lab has served private companies, long-term care facilities, underserved communities, and private schools and daycares during the last year. Concentric by Ginkgo, a public health and biosecurity program at Ginkgo Bioworks, has set the goal of providing pooled testing to every school in the U.S. It runs testing in more than 15 states and has partnered with more than 800 schools.

Rapid Dx Labs, Ginkgo Bioworks Partner

Pooled testing involves combining swabs from all consenting individuals in a single classroom and runs them as a single test. The process can increase the number of tests processed in a single go, and it also reduces the cost of the procedure for institutions.

“Rapid Dx Labs is incredibly honored to be partnered with Ginkgo Bioworks for such a historic effort,” said the Rapid Dx Founding Board members in a press release. “We need to prioritize children and their education, and we need to be taking any step that would help ensure a swift return to learning in person for our next generation. We must educate and highlight the importance of the role their participation in pooled classroom testing plays for the betterment of our future.”

“Pooled testing is a powerful testing modality for schools looking to operate in-person or hybrid learning environments,” said CEO and co-founder of Ginkgo Bioworks Jason Kelly. “Having the ability to test every student, every week, means that a community can, in a data-driven way, build confidence around the mitigation strategies they’re using to interrupt viral transmission.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.