Kroger Donates $3M to University of Louisville Indoor Baseball Facility

The Kroger Louisville Division announced this week that it is donating $3 million toward the construction of an indoor baseball practice facility at the University of Louisville in Louisville, Ky. The facility will be built onto the campus’ Jim Patterson Stadium.

The gift will come in yearly $300,000 installments over 10 years. The university is still seeking funds for the facility, which will cost an estimated $12 million. It has not yet established a timetable for construction, but design plans indicate a 28,000–35,000-square-foot facility featuring an indoor artificial turf surface, a pitching lab, and sufficient space for an entire infield.

“Kroger has made an amazing difference in the community, across campus, and by supporting our student athlete experience,” said Vince Tyra, University of Louisville Vice President/Director of Athletics. “We have a number of shared values that led us to today’s announcement of Kroger’s lead gift toward an indoor performance facility for our baseball team.”

“We are proud to announce our gift of $3 million to be donated toward the construction of the new indoor baseball practice facility here at Jim Patterson Stadium,” said Ann Reed, Division President of Kroger Louisville. “This new facility will help ensure the best recruits and talent come right here to Louisville.”

Other Kroger donations to University of Louisville athletics include sponsorship of the Governor’s Cup trophy (awarded to the winner of the yearly Kentucky-Louisville football game) and $10,000 in scholarships annually since 1994.

“This is a great day for the Louisville baseball program,” said the university’s head baseball coach, Dan McDonnell. “Our program is all about excellence, a value that we share with Kroger. Excellence in the classroom, on the diamond, and in this great community. We want to express our gratitude to Ann Reed and the Kroger family for their commitment to Louisville baseball and our continued pursuit of excellence.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.