P.K. Yonge Middle-High School Construction Complete

SchenkelShultz Architecture announced this week that construction of the Middle-High School at the P.K. Yonge Developmental Research School in Gainesville, Fla., is complete. The public, K–12 school was designed to meet the LEED Gold Certification standard as set by the U.S. Green Building Council.

Affiliated with the University of Florida College of Education, the school is known for its innovative educational curricula and programs that provide each student with an optimized learning experience and environment. The facility was also awarded first place in the Architectural Showcase presented by the Florida Education Facilities Planners’ Association (FEFPA).

P.K. Yonge Developmental Research School

“Our goal was to design a physical environment that was an embodiment of the school’s mission to ‘design, test and disseminate innovations in education,’” said J. David Torbert, partner with SchenkelShultz Architecture. “We collaborated closely with P.K. Yonge’s Leadership Team, educators and students to create a new building that prioritizes active, participatory learning within a safe and secure environment.”

The three-story building was designed to create a student-centered, flexible, and technology-rich learning environment that fosters collaboration. It features amenities like STEM labs, open collaboration areas, distance-learning labs, open collaboration spaces, and break-out spaces for small groups. It was built to replace an existing, 60-year-old facility.

The construction manager for the project was Parrish McCall Constructors.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition