SRG Partnership Designs Net Zero Energy Building for OSU Cascades Campus

Architecture firm SRG Partnership recently announced that it has designed a Net Zero energy building for the Cascades Campus of Oregon State University in Bend, Ore. Edward J. Ray Hall will serve as a Science, Technology, Engineering, Arts and Math (STEAM) learning center featuring both interior and exterior active learning spaces. The facility has a Net Zero energy target and a structure made of regionally sourced mass timber.

The 50,000-square-foot, four-story building will be the first to take advantage of a 46-acre site that the university acquired for campus expansion. The site contains a reclaimed pumice mine, and a press release notes that Edward J. Ray Hall will stand at the top of the mine’s steep eastern rim, serving as a gateway between the existing campus and future developments in and around the former mine’s bowl.

Edward J Ray Hall at Oregon State University Cascades Campus

The use of mass timber ties into the university’s commitment to sustainability, using locally sourced renewable materials and leaving a low carbon footprint. The building’s east-west orientation, along with large windows and vertical shading devices, allows it to take advantage of the sun’s position to maximize daylight while reducing glare and summer heat. The roof will feature an array of photovoltaics as a source of on-site renewable solar energy for the building.

The design and prototype process focused on accommodating as wide a variety of education activities as possible to encourage interdisciplinary collaboration, social equity, and sustainability. Edward J. Ray Hall serves as a scalable, adaptable proof of concept that will serve as a template for future buildings while leaving plenty of room for adaptation unique to these future buildings’ purpose, location, and conditions.

The total cost of the new facility is estimated at $49 million, and it is scheduled to open in fall 2021. Various donors contributed a total of $10 million to match funds provided by the state.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

Digital Edition