BGSU Breaks Ground on School of the Built Environment Facility

Bowling Green State University in Bowling Green, Ohio, held a groundbreaking ceremony last week for a new School of the Built Environment facility. Once complete, the building will play home to the construction management and architecture and environmental design programs. The project comes with a $10.4-million price tag and is scheduled for completion during the 2022-23 academic year.

The work includes a 22,900-square-foot expansion of an existing academic building on Park Avenue, which currently houses the architecture and environmental design program, and the new construction of an adjacent building. The new space will feature a 6,500-square-foot innovation lab for fabrication and construction classes, two digital labs, a materials and soils lab, classrooms and collaboration spaces.

“Having both programs under one location allows students in architecture and environmental design and construction management to learn from each other, which better prepares them for working on multidisciplinary teams,” said Dr. Joe B. Whitehead Jr., BGSU provost and senior vice president for Academic and Student Affairs. “It also allows our faculty to engage in collaborative research that will provide a deeper understanding of both fields, enhancing collaborative opportunities and driving student success.”

The School of the Built Environment is the only one of its kind in the state. BGSU also offers one of two Construction Management programs in Ohio and about 60 nationwide accredited by the American Council for Construction Education. The Park Avenue building had been previously renovated in 2014 to feature amenities like studios, a materials and reference library, a print room with plotters and laser cutters and an administrative suite for the architecture and environmental design program.

“As a public university for the public good, BGSU recognizes the importance of educating construction management students who understand design and architecture students who understand construction,” said BGSU President Rodney K. Rogers. “This innovative facility will increase collaboration in the School of the Built Environment, and it will better serve students, who will be prepared for productive careers and meet the workforce needs in Ohio and beyond.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California High School Opens New Classroom Building for 7th-, 8th-Graders

    Santa Rosa City Schools in Santa Rosa, Calif., recently announced the completion of a new classroom building for Piner High School. As the campus transitions to a Junior/Senior High School, the facility will play home to the school’s new population of seventh- and eighth-grade students.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.