Texas High School Debuts Arts Program Expansion

Melissa High School in Melissa, Texas, recently completed a 65,000-square-foot expansion in conjunction with the Perkins&Will Dallas studio. The new space includes a new practice gymnasium, an extension of the student union, a new performance theater, and an addition to the fine arts program.

Perkins&Will Melissa High School

The fine arts program addition includes a new entryway, lobby, 1,000-seat auditorium, and other amenities like rehearsal spaces, a percussion hall outfitted with live recording capabilities, and a scene shop. One goal of the project was to highlight the district’s commitment to and passion for the arts.

Perkins&Will Melissa High School

A design narrative explains how Perkins&Will worked with the school’s existing architecture, tying together old and new. A “garden zone” of native plants complements the school’s natural landscape with the main lobby entrance, as well as serving as a gathering place for event overflow. The fine arts wing was designed to be as flexible as possible regarding spacing, lighting, acoustics, and more.

Perkins&Will Melissa High School
Photos courtesy of Charles Davis Smith

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition