Mass. Town Breaks Ground on $60M Elementary

Groundbreaking has taken place on a new elementary school in Amesbury, Mass. Construction of the Sgt. Jordan Shay Memorial Lower Elementary School was approved by city residents in 2019. The $60-million facility will sit next to the Cashman Elementary School, creating a two-building campus where students in preK–2 will attend the new school and students in grades 3–5 will attend Cashman.

The school is intended to use green design principles, with a projected savings of 28% in site energy use and 35% in reduced water use.

Project management is being handled by NV5. DiNisco Design is serving as architect for the building. The construction contract was awarded to CTA-Construction Managers. Civil engineering is being done by DGT Associates. And Brown + Sardina was named landscape architect. All are Massachusetts-based companies.

Sgt. Jordan Shay Memorial Lower Elementary School

The facility is being named after Jordan Shay, who grew up in Amesbury and died in Iraq during his second deployment. According to a foundation that was formed under his name, Shay specified in a "just in case letter" that if something were to happen to him, he wanted a scholarship fund to be started for students who "want to make a difference in the world." The foundation is led by Shay's mother, Holly.

Construction is expected to be done in March 2023.

Amesbury has posted all documents related to the project on a city website.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition