Mass. Town Breaks Ground on $60M Elementary

Groundbreaking has taken place on a new elementary school in Amesbury, Mass. Construction of the Sgt. Jordan Shay Memorial Lower Elementary School was approved by city residents in 2019. The $60-million facility will sit next to the Cashman Elementary School, creating a two-building campus where students in preK–2 will attend the new school and students in grades 3–5 will attend Cashman.

The school is intended to use green design principles, with a projected savings of 28% in site energy use and 35% in reduced water use.

Project management is being handled by NV5. DiNisco Design is serving as architect for the building. The construction contract was awarded to CTA-Construction Managers. Civil engineering is being done by DGT Associates. And Brown + Sardina was named landscape architect. All are Massachusetts-based companies.

Sgt. Jordan Shay Memorial Lower Elementary School

The facility is being named after Jordan Shay, who grew up in Amesbury and died in Iraq during his second deployment. According to a foundation that was formed under his name, Shay specified in a "just in case letter" that if something were to happen to him, he wanted a scholarship fund to be started for students who "want to make a difference in the world." The foundation is led by Shay's mother, Holly.

Construction is expected to be done in March 2023.

Amesbury has posted all documents related to the project on a city website.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition