Wesleyan Breaks Ground on New Art Gallery

On the campus of Wesleyan University in Middletown, Conn., officials broke ground this week on a new art gallery. The Davison Art Gallery will be the campus’ first new art building since the mid-1970s. The university is partnering with design firm Peterson Rich Office (PRO) and Newman Architects on the project, which is projected for completion in summer 2023 and to open its doors to students for the spring 2024 semester.

The university found itself outgrowing its existing art gallery, the Davison Art Center, which houses a collection of more than 25,000 works of art. The collection was already relocated to the Olin Memorial Library in 2019. The new facility will measure in at 5,550 square feet and was designed as a long, narrow space to fit between the library and the Public Affairs Center.

“The new gallery presents an opportunity to expand the visual arts from the iconic Kevin Roche-designed Center for the Arts to the very heart of the campus,” said PRO founders Nathan Rich and Miriam Peterson. “The building is deliberately designed for interdisciplinary learning and to expose a range of students to this renowned collection.”

The facility will feature an open, glass-walled lobby space and an exterior of red brick and limestone to blend into the surrounding area. An outdoor teaching courtyard and exterior gathering space will serve as active learning environments for a variety of courses. Sustainability initiatives include a green roof, solar panels, in-flooring heating and cooling, motion-sensor lighting, displacement ventilation and a landscape of native plants. The gallery represents PRO’s first full, ground-up project in the education vertical.

The Davison Art Gallery is being constructed simultaneously with renovations to the adjacent Public Affairs Center (PAC). The gallery will be accessible through the PAC as well as via walkways in front of and behind the library.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

Digital Edition