Central State University Breaks Ground on Honors Dorm

On the campus of Central State University in Wilberforce, Ohio, officials recently broke ground on a new residence hall for students enrolled in the university’s Honors College. Construction on the $15-million facility is set to begin this month, be completed by July 2022 and open to students in time for the fall 2022 semester, according to local news.

The facility will cover 57,000 square feet of currently undeveloped space between the university’s library and the National Afro-American Museum & Cultural Center. The three-story facility will feature 119 beds, as well as amenities like multipurpose space, common areas, interactive study areas, and a lounge/dining area.

The CSU Honors College opened less than a year ago and has a current enrollment of a little more than 200 students. “Valedictorians, salutatorians, merit finalists…these individuals will be those high-achieving students, and this residence hall will hold many of those students,” said Dr. Jack Thomas, CSU President.

The facility was developed by national campus housing company University Housing Solutions. “This is going to be apartment-style housing—mostly two-bedroom units, but we do have one-bedroom studios, as well,” said Meghan Schmidt, the development director for University Housing Solutions.

Ohio Governor Mike DeWine attended the groundbreaking ceremony on Friday, Aug. 6. “It’s always great to meet students and hear what their vision is and what they want to do,” he said.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

  • School Construction Projects Boom as Education Systems Address Aging Facilities and Growth

    Construction opportunities are almost always abundant, but currently there are more than usual construction projects being launched for public school campuses. Common objectives include major renovation or expansion of aging facilities, total replacement of inefficient classrooms, upgrades to lighting, technology, and security equipment, and adding new sports and cultural facilities.

  • University of Kentucky Sees Positive Results from Energy Efficiency Program

    The University of Kentucky in Lexington, Ky., recently announced the results of its Energy Program in Facilities Management, put into place eight years ago, according to a news release. Between the fiscal years of 2017 and 2025, the university’s campus grew by 13.6% while the energy use per square foot dropped by 19.2%.

Digital Edition