ASI Group Launches Integrated Privacy System for Restroom Partitions

Commercial toilet partitions and washroom accessories solutions provider ASI Group recently launched the industry’s first Integrated Privacy System for metal bathroom partitions. The product was designed to provide privacy and built so that doors come delivered with built-in privacy components, reducing the need to modify or retrofit them after installation.

The product offers total privacy in that it closes the gap on both the latch and hinge sides of the door, blocking all sightlines into the bathroom stall. They also add an aesthetic touch, as retrofitted privacy components from other vendors tend not to match the design of the stall. The ASI Group product comes color-matched to the rest of the stall to add a unifying design across the partition door and pilasters. It also comes with an occupancy indicator latch and an Easy-Stall Shoe to ease the installation process.

“Our built-in need for privacy is laid bare in public washrooms, most of which are designed for multiple users and simultaneous use,” said Cyrus Boatwalla, Director of Marketing at the ASI Group. “Today, more than ever, our need to feel safe is paramount, and this can cause public washrooms to bring out deep-rooted fears, which may manifest in a visceral response. While some people may be mildly bothered by the thought of using a public washroom, others are paralyzed by the prospect—to the point that they cannot use the washroom while others occupy it.”

The patent-pending Integrated Privacy System is available as standard in both the Stainless Steel and Powder Coated Steel partitions.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition