Houston-Area District Opens STEM Magnet Academy

The Stafford Municipal School District (SMSD), located near Houston, Texas, recently opened a new Science, Technology, Engineering and Mathematics (STEM) Magnet Academy. The $2.8-million facility is the first of its kind in Fort Bend County, and it can accommodate almost 200 students in grades 3–8. According to a press release, the school’s curriculum will focus on 21st-century skills like medical technology, coding, robotics and more.

“The SMSD philosophy is ‘STEM to Learn, STEM to Earn,’ and it was really built and born here,” said SMSD Superintendent Dr. Robert Bostic. “Eight years ago, we started with incorporating robotics, drones SWIFT coding, and gaming into our curriculum because we looked at the future outlook of where jobs would be. We came up with these plans—including our newest jewel, the STEM Magnet Academy. In its inaugural year, students are set up for success through project-based curriculum, partnerships, mentorships, and we’re also planning for international travel when it’s safe to do so. We are cutting and blazing a path that others have not done.”

Stafford MSD STEM Magnet Academy
Photo courtesy of Lockwood Andrews & Newnam, Inc. (LAN)

The new academy measures in at 67,000 square feet and features amenities like 32 classrooms, two science rooms, a gaming room, a medical and coding lab, a robotics lab and a reading room. It also includes breakout areas for collaboration and a learning staircase allowing two teachers to combine their classes and offer larger-group instructions.

“Unlike Career and Technical Education programs that are typically offered to high school students, this STEM Magnet Academy will prepare students to learn specialized skills like coding and robotics from an early age,” said Victor Fleming of Lockwood Andrews & Newnam, Inc. (LAN), which served as the program manager for the bond program.

The facility was designed by AutoArch Architects and constructed by Jamail & Smith Construction. It was built as part of a $62-million bond program that passed in November 2017. The ultimate goal of the bond was to provide funds to address growth and expansion within SMSD, which enrolled about 3,600 students during the 2019-20 academic year. SMSD is the only municipal school district in Texas.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Studio G Announces Completion of New Massachusetts Elementary School

    The Groton-Dunstable Regional School District in Groton, Mass., recently announced the completion of a new elementary school, according to a news release. Florence Roche Elementary School measures in at 110,000 square feet and has the capacity for 645 students in grades K–4.

  • Washington University School of Medicine Completes $165M Expansion Project

    The Washington University School of Medicine in St. Louis, Mo., recently completed a vertical expansion of its Steven & Susan Lipstein BJC Institute of Health (BJCIH), according to a news release. The university partnered with Lawrence Group for the design of the six-floor addition, which cost about $165 million.

  • New Campus Stadiums Evolve Beyond Sports into Community Assets

    New campus planning documents reveal an abundance of high interest in new stadiums, or renovations and repurposing projects for existing facilities. Many universities, in fact, are developing campus complexes with new stadiums as a draw for retail, hotels, and student housing. Multipurpose facilities with high-end features are being designed to attract large sports events of various types, concerts, and other university functions.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.