Virginia Tech Breaks Ground on New Campus

With a celebratory groundbreaking ceremony, construction has officially begun on the Virginia Tech Innovation Campus in Alexandria, Va. University, government and business leaders gathered on Tuesday, Sept. 14, to mark the first steps of the first academic building of the new campus. The new facility is scheduled to open its doors to students, faculty and staff in fall 2024.

“It’s a day many years in the making, made possible by a broad group of partners who were willing to support a bold vision to advance research, graduate education and community engagement in the greater Washington, D.C., metro area,” said Virginia Tech President Tim Sands to a crowd of more than 200.

According to university news sources, the Innovation Campus will offer graduate-level programs in computer engineering and computer science, as well as project-based initiatives that will partner students with local industry leaders. Boeing announced in May of this year that it was investing $50 million in the new campus as its first foundational partner. The funds will help create scholarships and recruit faculty and researchers.

“Our vision for the Innovation Campus is to be both a place and a culture that unlocks the power of diverse people and ideas to solve the world’s most pressing problems through technology,” said Lance Collins, vice president and executive director of the Innovation Campus. “Diversity isn’t just a core value to me. It is a measure of excellence that will ensure the Innovation Campus delivers on its full potential.”

The new academic building will stand 11 stories and measure in at 300,000 square feet, and according to university news, its design draws on principles of sustainability, health and wellness, green and social spaces, accessibility, connectivity, flexibility and integrated technology. The campus itself will cover 3.5 acres and is being developed in North Potomac Yard, near a future Potomac Yard Metrorail Station.

The long-term plan for the Innovation Campus includes the construction of two other buildings, each about 150,000 square feet, as campus grows. The university partnered with Sasaki to create a master plan for the campus and with SmithGroup to design the new academic building. Construction is being handled by JBG Smith.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.

  • Georgia State University Opens New Research Tower

    Georgia State University in Atlanta, Ga., recently held a ribbon-cutting ceremony for a new, nine-story, 155,000-square-foot Research Tower, according to university news. Amenities include academic classrooms, a large lecture space, teaching labs, faculty research space, and the uppermost floors reserved for future expansion.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.