Virginia Tech Breaks Ground on New Campus

With a celebratory groundbreaking ceremony, construction has officially begun on the Virginia Tech Innovation Campus in Alexandria, Va. University, government and business leaders gathered on Tuesday, Sept. 14, to mark the first steps of the first academic building of the new campus. The new facility is scheduled to open its doors to students, faculty and staff in fall 2024.

“It’s a day many years in the making, made possible by a broad group of partners who were willing to support a bold vision to advance research, graduate education and community engagement in the greater Washington, D.C., metro area,” said Virginia Tech President Tim Sands to a crowd of more than 200.

According to university news sources, the Innovation Campus will offer graduate-level programs in computer engineering and computer science, as well as project-based initiatives that will partner students with local industry leaders. Boeing announced in May of this year that it was investing $50 million in the new campus as its first foundational partner. The funds will help create scholarships and recruit faculty and researchers.

“Our vision for the Innovation Campus is to be both a place and a culture that unlocks the power of diverse people and ideas to solve the world’s most pressing problems through technology,” said Lance Collins, vice president and executive director of the Innovation Campus. “Diversity isn’t just a core value to me. It is a measure of excellence that will ensure the Innovation Campus delivers on its full potential.”

The new academic building will stand 11 stories and measure in at 300,000 square feet, and according to university news, its design draws on principles of sustainability, health and wellness, green and social spaces, accessibility, connectivity, flexibility and integrated technology. The campus itself will cover 3.5 acres and is being developed in North Potomac Yard, near a future Potomac Yard Metrorail Station.

The long-term plan for the Innovation Campus includes the construction of two other buildings, each about 150,000 square feet, as campus grows. The university partnered with Sasaki to create a master plan for the campus and with SmithGroup to design the new academic building. Construction is being handled by JBG Smith.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • PNSI Global Alliance Launches New Quality Assurance Certification

    PNSI Global Alliance, a network of technology integrators and service providers, recently introduced a new Quality Assurance Certification (QAC) for AV service and support, according to a press release. The two-day, interactive workshop QAC course is designed for Certified Solution Providers (CSPs) to provide them with the most up-to-date and advanced quality assurance knowledge available.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

  • a traditional red brick school building with the right side visibly deteriorated and the left side well-maintained, surrounded by neat landscaping

    Making the Grade: Navigating Funding Uncertainty in K-12 Schools

    School districts across the country must prepare for all possible funding scenarios by analyzing school asset and infrastructure conditions, understanding their funding needs, and developing a proactive maintenance strategy to stretch their funding dollars.

Digital Edition