Mitsubishi Electric Trane HVAC US Announces Platform Upgrade

Mitsubishi Electric Trane HVAC US (METUS), a joint venture between Trane Technologies PLC and Mitsubishi Electric US, Inc., announced recently that it has launched an upgrade for its Building Connect+ platform. METUS is a leading supplier of ductless and ducted mini-split and variable refrigerant flow (VRF) heat-pump and air-conditioning solutions, while Building Connect+ serves as a cloud-based controls and monitoring platform.

The platform is a pre-engineered and allows for the control and management of CITY MULTI systems, as well as third-party devices that have BACnet connectivity. It reduces the initial installation, pairing costs and commissioning time via a web-based portal. It requires no programming, software, or licenses to control or monitor units.

A press release explains that Building Connect+ makes use of an on-site panel to connect central controllers and third-party equipment to the cloud-based platform. It can auto-discover and connect up to four centralized controllers, 200 indoor units and 10 BACnet devices. One or multiple panels can also be added under a single cloud account, allowing for an increase in connectable units, the expansion of remote access across multiple locations and the expansion of the number of connected users.

“We’re pleased to introduce this expansion of the Building Connect+ platform for our customers,” said Steve Vogel, product manager, controls product planning for Mitsubishi Electric Trane HVAC US. “We listened to what our customers were saying about their system requirements. As a result, we increased the Building Connect+ application use cases and capabilities.”

The Building Connect+ customizable dashboards allow users access to the User Management console, VRF system overview, BACnet equipment overview, Maintenance tool Data, Alarming, Scheduling, Trending and Auto Changeover setup. Other system features include secure, cloud-based connectivity; event logs to track events, actors and resolution; Auto Import functionality; pre-programmed applications; alarm notifications and displays for all connected equipment; local and remote web connectivity via personal devices; and real-time data trending and export capabilities.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • New Jersey PreK–12 School Breaks Ground on New STEM Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently announced that it has broken ground on the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIGroup Architecture for the design of the new facility, which will provide the school with space to expand its STEM and business education classes.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition