Georgia District Breaks Ground on $118M K–12 Facility

A groundbreaking ceremony was held on Thursday, Sept. 30, for a new K–12 Multi-Campus facility for Savannah-Chatham County Public Schools in Garden City, Ga. The facility comes with an estimated price tag of $118 million and will cover almost 400,000 square feet. The facility will consolidate students from three local schools—Gould Elementary School, Mercer Middle School and Groves High School—underneath one roof, and it is scheduled to open in August 2023. The school is being built on the former site of Groves High School.

The campus will include amenities like a digital media lab; CTAE labs for aviation and logistics as well as business and family consumer sciences; a football stadium; a track-and-field area; soccer fields and tennis courts; a baseball field and softball field; two indoor gyms; and a 750-seat, two-story auditorium featuring a full-size performance stage. The campus will feature three paved parking lots with a capacity for 660 cars. Construction also includes the installation of a new traffic signal and the campus’ entrance for more controlled traffic flow.

The facility will have a capacity for 2,400 students. It is being funded through Education Special Purpose Local Sales Tax III dollars. The district is partnering with Charles Perry Partners, Inc., for construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.