Kimball Introduces Modular Workplace Platform

Furniture solutions provider Kimball recently launched a modular workplace platform that adds flexibility to any environment. EverySpace allows users to create their own workspace design to meet changing needs and work styles. The product was designed in partnership with CSD Studio.

The platform offers private and open plan applications, as well as desks, tables and screens, to offer a high degree of versatility and adaptability in size, both vertically and horizontally. A wide variety of configurations of storage, shelves, filing, and screens can accommodate every environment from focused and shared workspaces to collaborative and social ones. The products feature fixed and adjustable-height legs and an integrated wire management channel to keep the space uncluttered. Tiered landscapes add extra flexibility for ergonomic design and space division.

Kimball EverySpace
Photo Courtesy of Kimball

“EverySpace inspires designers and end-users to have a completely different visual respect for the workplace,” said Wendy Murray, Vice President of Brand Marketing for Kimball International. “As the needs and expectations of the physical workplace are changing, EverySpace is a complete, flexible offering that fosters belonging and allows people to feel connected with each other and the organization while facilitating performance and supporting well-being.”

More information about EverySpace is available on the company’s website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.