U Alabama Trying Out Solar-Powered Pods

Shortly, the campus of the University of Alabama will sport a set of small, greenhouse-like structures where students can have private, socially-distanced space for their studies or relaxation. The university is working with SolarFi, a start-up that produces the pods. The Privé, as it's called, is equipped with solar panels, electrical charging points, HEPA air filters, ventilation and cooling systems.

The units can accommodate anywhere from one to 15 people, according to the company. They're constructed from a "highly resistant, fully transparent and safe polycarbonate structure," made from recycled materials and provide UV ray protection.

"I'm looking forward to spending time in the Privé pod. I always sit near the window while studying," said freshman Austin Rilling, an engineering student, in a press release. "To see SolarFi's pods on campus is like Christmas coming early. I get to study, relax in a bean bag and charge up all my devices using solar power in the pods."

"With solar energy and the Internet, we will empower students to study in nature without losing power," added SolarFi Creative Director Antonio Dixon.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.