Harvard Divinity School Completes Renovation of Swartz Hall

Harvard Divinity School in Cambridge, Mass., recently announced that the renovation and expansion project for Swartz Hall has been completed. According to a news release, the 60,000-square-foot renovation and 13,000-square-foot expansion began in May 2019 and was finished in August 2021. Swartz Hall was originally built in 1911 and serves as the hub of academic, administrative and student life for the program.

Harvard University partnered with construction management firm Shawmut Design and Construction and architecture firm Ann Beha Architects in tacking the building’s first major renovation since its original completion.

“The completion of this historic renovation of Swartz Hall marks a significant milestone in the celebrated legacy of Harvard Divinity School,” said Kevin Sullivan, executive vice president of Shawmut Design and Construction’s New England region. “Our team expertly navigated the preservation of the building’s historical significance and character-defining details while increasing energy efficiency and creating a welcoming, accessible, and modern environment that embodies the school’s vision for an inclusive campus.”

Harvard Divinity School Swartz Hall

The two-story addition features a glass façade to allow for maximum daylighting and scenic views of the campus. The ground level features a dining commons area, a fireplace lounge made of repurposed granite from the original structure, an outdoor terrace and a granite front porch. The new addition’s second floor contains a 200-seat multipurpose area and classrooms integrated with projectors, monitors, cameras, microphones and touch-panel control systems.

Shawmut also balanced preserving the historic campus building with modernizing it and making it more energy efficient. Renovations to the mechanical system and building envelope, including replacing the roof, are meant to reduce energy consumption. The building’s former stack wing, which contained five levels of book shelving, has been replaced with three levels of classrooms and workspaces and a new multi-faith space. According to a news release, one of the primary goals of the project was to create a space in which all members of the HDS community felt welcome, no matter their faith.

The project was completed with certain sustainability goals in mind: The renovations targeted LEED Gold or higher, and also a Living Building Challenge Materials Petal. Another sustainability goal was to divert a minimum of 75% of construction and demolition waste away from landfills, including repurposing granite and wood from the original structure throughout the building.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Greenheck Debuts New Energy Recovery Ventilator

    Greenheck recently released a new energy recovery ventilator, the ERVi, designed for small indoor spaces like basements and mechanical rooms, according to a news release. The hardware can fit through a 30-inch door and be mounted on the ceiling for retrofit and decarbonization projects.

  • Texas School District Opens New Elementary School

    The Boerne Independent School District (Boerne ISD) near San Antonio, Texas, recently opened a new elementary school that serves almost 500 students, according to a news release. The district partnered with Pfluger Architects to build the 97,151-square-foot Viola Wilson Elementary School, which opened in August.

  • Minnesota High School Completes $226M Addition, Renovation Project

    White Bear Lake Area High School – North Campus in White Bear Lake, Minn., recently announced the completion of a $226-million renovation and addition project, according to a news release. The district partnered with Kraus-Anderson for the project’s construction, which involved creating a single high-school site for the White Bear Lake Area School District.

  • New Jersey High School Debuts Auditorium Renovation, Technical Upgrades

    Plainfield High School in Plainfield, N.J., recently completed a series of construction projects including an auditorium renovation, a new eSports gaming arena, and a black-box theater, according to a news release. The school partnered with PureTek Group to install the Pliant Technologies CrewCom professional wireless intercom system.

Digital Edition