Harvard Divinity School Completes Renovation of Swartz Hall

Harvard Divinity School in Cambridge, Mass., recently announced that the renovation and expansion project for Swartz Hall has been completed. According to a news release, the 60,000-square-foot renovation and 13,000-square-foot expansion began in May 2019 and was finished in August 2021. Swartz Hall was originally built in 1911 and serves as the hub of academic, administrative and student life for the program.

Harvard University partnered with construction management firm Shawmut Design and Construction and architecture firm Ann Beha Architects in tacking the building’s first major renovation since its original completion.

“The completion of this historic renovation of Swartz Hall marks a significant milestone in the celebrated legacy of Harvard Divinity School,” said Kevin Sullivan, executive vice president of Shawmut Design and Construction’s New England region. “Our team expertly navigated the preservation of the building’s historical significance and character-defining details while increasing energy efficiency and creating a welcoming, accessible, and modern environment that embodies the school’s vision for an inclusive campus.”

Harvard Divinity School Swartz Hall

The two-story addition features a glass façade to allow for maximum daylighting and scenic views of the campus. The ground level features a dining commons area, a fireplace lounge made of repurposed granite from the original structure, an outdoor terrace and a granite front porch. The new addition’s second floor contains a 200-seat multipurpose area and classrooms integrated with projectors, monitors, cameras, microphones and touch-panel control systems.

Shawmut also balanced preserving the historic campus building with modernizing it and making it more energy efficient. Renovations to the mechanical system and building envelope, including replacing the roof, are meant to reduce energy consumption. The building’s former stack wing, which contained five levels of book shelving, has been replaced with three levels of classrooms and workspaces and a new multi-faith space. According to a news release, one of the primary goals of the project was to create a space in which all members of the HDS community felt welcome, no matter their faith.

The project was completed with certain sustainability goals in mind: The renovations targeted LEED Gold or higher, and also a Living Building Challenge Materials Petal. Another sustainability goal was to divert a minimum of 75% of construction and demolition waste away from landfills, including repurposing granite and wood from the original structure throughout the building.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

Digital Edition