Northern Arizona University Opens New Athletic Center

Officials from Northern Arizona University in Flagstaff, Ariz., recently gathered to celebrate the grand opening of a new athletic facility. The Student-Athlete High Performance Center measures in at 72,000 square feet and cost about $46 million. A news release notes that it is the university’s first athletics facility to be partially funded via alumni and former student-athlete donations.

The center provides vastly expanded space for student-athletes’ academic, weight training, recovery and nutrition needs. The facility’s Grand Hall also features memorabilia from past athletic success. Visitors enter the Grand Hall across a 140-foot walking bridge that elevates them to canopy level of the surrounding forest.

Northern Arizona University Student-Athlete High Performance Center

“Our design embodies the NAU Lumberjack brand and reinforces NAU’s culture as an institution and a championship-caliber athletics program,” said Andrew Kelly, DLR Group Sports Design Leader. “The iconic Parsons Family Auditorium undeniably features one of the best views of any training facility in the country, sitting above the tree line with a 60’ x 40’ glass wall that frames unobstructed views of the 12,600 ft Humphreys Peak and the San Francisco Range.”

The center features amenities like the nation’s largest high-altitude training chamber on a university campus, which simulates a variety of atmospheric conditions. The Scott and Franci Free Academic Center provides about 7,000 square feet of individual study space, three classrooms, staff offices and a computer lab. The Jennifer Marie Wilson Strength and Conditioning Center gives student-athletes a total of 11,500 square feet of weight training space. The Michael E. Nesbitt Athletic Training Center, meanwhile, offers three hydrotherapy recovery pools.

The university partnered with DLR Group for the facility’s design and with CORE Construction for the construction phase.

“CORE truly enjoyed the opportunity to partner with DLR Group in constructing this state-of-the-art facility for NAU Athletics, which will draw and serve student athletes who are national leaders in collegiate competition,” said Emerson Ward, CORE’s Director of Higher Education. “In the execution of the High-Performance Center project, our team was inspired by the energy that NAU Athletics and the student athletes bring to the ‘field’ every day, and we are excited to see this new facility help the Lumberjacks excel to new heights.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • Three U.S. Universities Install Acre Security Access Control Platform

    Cloud-native physical and digital security solutions company Acre Security recently announced that it has deployed its access control platform at three major universities in the U.S., according to a news release. Acre partnered with Atrium Campus to provide coverage for more than 69,000 students at the University of Virginia (UVA), George Mason University, and Rockhurst University.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition