Texas District Breaks Ground on K–8 Tech Campus

The Manor Independent School District in Manor, Texas, recently broke ground on a new, technology-focused campus that will serve students in grades K–8. The future facility will measure in at two stories and 116,000 square feet, and it will have a capacity of about 800 students.

Amenities are set to include a large media center, two art rooms, three maker spaces, two gymnasiums, a performing arts classroom, and student collaboration areas and flex space, according to a news release.

“Not only is this a momentous occasion for Manor ISD because it marks the first step in building a new, state-of-the-art facility for our district’s scholars, but it is groundbreaking because it will be the first campus of its kind in our region,” said Manor ISD Superintendent Dr. Andre D. Spencer. “This campus will serve K–8 students under one roof, which is a rare educational model in the public school system in our state. We are excited about the many proven benefits of this model, including lower levels of anxiety among middle schoolers.”

Funds for the project come from a $280-million bond package that local voters approved in November 2019. The package focused on projects that would accommodate student growth; upgrade and repair existing facilities; and improve transportation, technology and security. Enrollment projections predict that the district is set to grow by 2.5 to 5 percent per year for the next ten years.

The district is partnering with HPM as program manager in charge of project management, quality control and preconstruction services. It’s also partnered with architecture firm ADM Group, Inc. and construction manager at risk Lee Lewis Construction Inc.

“HPM is proud to lead Manor ISD and our project partners through the development of this exciting project,” said HPM Senior Program Manager Andrew Betts. “This campus will provide a unique opportunity to incorporate technology and interactive learning within nine levels of education, all on one campus. This ceremony is a symbol of Manor ISD’s commitment to providing the best educational resources for the scholars within this community.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Q&A: How to Prevent Kitchen Grease Fires in Commercial Kitchens

    School cafeterias and university dining halls serve thousands of meals daily, relying on high-heat equipment like fryers, grills, and ovens. While these operations keep students fed, they also generate significant grease-laden vapors. Without proper controls, this grease becomes a silent fire threat. As a certified exhaust cleaning specialist and business coach who has helped hundreds of institutional facilities achieve NFPA 96 compliance, I emphasize that proactive grease management isn’t optional; it’s a core fire/life safety practice.

  • Washington State University Debuts New Engineering Hall

    Washington State University recently celebrated a dedication ceremony for the new Schweitzer Engineering Hall on its Pullman campus in Pullman, Wash., according to university news. The facility measures 66,288 square feet, and its completion marks the first milestone in a larger university effort to modernize the engineering and design district.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.