Texas District Breaks Ground on K–8 Tech Campus

The Manor Independent School District in Manor, Texas, recently broke ground on a new, technology-focused campus that will serve students in grades K–8. The future facility will measure in at two stories and 116,000 square feet, and it will have a capacity of about 800 students.

Amenities are set to include a large media center, two art rooms, three maker spaces, two gymnasiums, a performing arts classroom, and student collaboration areas and flex space, according to a news release.

“Not only is this a momentous occasion for Manor ISD because it marks the first step in building a new, state-of-the-art facility for our district’s scholars, but it is groundbreaking because it will be the first campus of its kind in our region,” said Manor ISD Superintendent Dr. Andre D. Spencer. “This campus will serve K–8 students under one roof, which is a rare educational model in the public school system in our state. We are excited about the many proven benefits of this model, including lower levels of anxiety among middle schoolers.”

Funds for the project come from a $280-million bond package that local voters approved in November 2019. The package focused on projects that would accommodate student growth; upgrade and repair existing facilities; and improve transportation, technology and security. Enrollment projections predict that the district is set to grow by 2.5 to 5 percent per year for the next ten years.

The district is partnering with HPM as program manager in charge of project management, quality control and preconstruction services. It’s also partnered with architecture firm ADM Group, Inc. and construction manager at risk Lee Lewis Construction Inc.

“HPM is proud to lead Manor ISD and our project partners through the development of this exciting project,” said HPM Senior Program Manager Andrew Betts. “This campus will provide a unique opportunity to incorporate technology and interactive learning within nine levels of education, all on one campus. This ceremony is a symbol of Manor ISD’s commitment to providing the best educational resources for the scholars within this community.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.