Texas Private School Breaks Ground on $3.5M Track & Turf Project

Fort Worth Country Day, a college preparatory school in Fort Worth, Texas, recently announced that ground has been broken on a $3.5-million athletics improvement project. Updates include renovations to its existing track and two athletic fields with higher-caliber surfaces and technologies, and the school will be the first venue in the Dallas-Fort Worth area to utilize them, according to a news release. The project is scheduled for completion in fall 2022.

One of the school’s field hockey fields will become a “wet” hockey field, which the press release notes is the “gold standard in competitive field hockey and comparable to fields played on during World Cup Field Hockey matches.” The water-based turf is manufactured by SporTurf and uses a water cannon irrigation system that allows the school to weather the field before use.

Secondly, the grass field at Rosacker Stadium will be replaced with a PowerBlade fiber-based turf surface field made by Shaw Sports Turf. The synthetic turf will act as padding to reduce shock absorption and also serves a temperature-control function that keeps it resistant to mildew, mold and salt.

Fort Worth Country Day track field project

Finally, the school’s Barrett Havran Track will feature the PTS 4000 paved-in-place system made by Paragon Track Surfaces. The base mat will be sealed with two-component polyurethane to create a fully impermeable surface, according to the news release.

“Our track and turf fields improvement project is truly game-changing for FWCD athletics,” said Eric Lombardi, FWCD’s head of school. “No more rainouts because of saturated fields; no more worries about wear-and-tear during practices or competition. We’ll have the ability to host international-caliber athletic events, all while showcasing our 104-acre campus. My top priority, however, is to ensure that FWCD student-athletes are able to pursue their athletic interests on safe fields and surfaces that offer the highest level of standards for competitive sports. Calling this project ‘transformative’ would be an understatement.”

The project is being funded by 21 FWCD donors. Fort Worth Country Day is partnering with Paragon Sports Constructors as the project’s design/build partner.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

Digital Edition