Texas Private School Breaks Ground on $3.5M Track & Turf Project

Fort Worth Country Day, a college preparatory school in Fort Worth, Texas, recently announced that ground has been broken on a $3.5-million athletics improvement project. Updates include renovations to its existing track and two athletic fields with higher-caliber surfaces and technologies, and the school will be the first venue in the Dallas-Fort Worth area to utilize them, according to a news release. The project is scheduled for completion in fall 2022.

One of the school’s field hockey fields will become a “wet” hockey field, which the press release notes is the “gold standard in competitive field hockey and comparable to fields played on during World Cup Field Hockey matches.” The water-based turf is manufactured by SporTurf and uses a water cannon irrigation system that allows the school to weather the field before use.

Secondly, the grass field at Rosacker Stadium will be replaced with a PowerBlade fiber-based turf surface field made by Shaw Sports Turf. The synthetic turf will act as padding to reduce shock absorption and also serves a temperature-control function that keeps it resistant to mildew, mold and salt.

Fort Worth Country Day track field project

Finally, the school’s Barrett Havran Track will feature the PTS 4000 paved-in-place system made by Paragon Track Surfaces. The base mat will be sealed with two-component polyurethane to create a fully impermeable surface, according to the news release.

“Our track and turf fields improvement project is truly game-changing for FWCD athletics,” said Eric Lombardi, FWCD’s head of school. “No more rainouts because of saturated fields; no more worries about wear-and-tear during practices or competition. We’ll have the ability to host international-caliber athletic events, all while showcasing our 104-acre campus. My top priority, however, is to ensure that FWCD student-athletes are able to pursue their athletic interests on safe fields and surfaces that offer the highest level of standards for competitive sports. Calling this project ‘transformative’ would be an understatement.”

The project is being funded by 21 FWCD donors. Fort Worth Country Day is partnering with Paragon Sports Constructors as the project’s design/build partner.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Jersey Day School Opens New Science & Entrepreneurship Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently celebrated the grand opening of the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIG Architecture on the 32,000 square foot facility, completed on a 17-month construction timeline in time for the beginning of the new school year.

  • S4L Announces 2026 Education Design Showcase Winners

    Spaces4Learning is thrilled to announce the winners of the 2026 Education Design Showcase! Now in its 27th year, the annual awards program honors innovative solutions in planning, design, architecture, and construction across K–12 and higher education.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Dallas-Area District Debuts Three New Facilities

    The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release.