Whitney Brothers Debuts Superbright LED Creative Cube

Children’s furniture solutions company Whitney Brothers recently introduced a new product that combines a play house cube and a light table. The Superbright LED Creative Cube features an LED light table mounted onto a play house cube, the underside printed with a forest canopy scene that ties into the brand’s biophilia-styled Nature View Collection.

According to a news release, the table itself features a new LED lighting system, a 30.5”-tall play surface, a power cord with an on/off switch, and UL listing to use in both Canada and the U.S. The cube’s green vinyl floor meets state requirements for quiet spaces in Early Learning environments. The product is intended to help save space in classrooms by combining two popular products found in many Early Learning facilities.

Whitney Brothers Superbright LED Creative Cube
Photo Courtesy of Whitney Brothers

“Our resolute goal is to design educational furniture that helps foster a child’s engagement to their learning environment,” said Mike Jablonski, president of Whitney Brothers. “The Superbright LED Creative Cube will delight and inspire children to learn, explore, discover and play, and we feel the product elegantly illustrates the fresh design thinking that distinguishes our brand.”

According to the news release, the Superbright LED Creative Cube coordinates with other pieces from the company’s Nature View Collection. The biophilic design aims to help reduce students’ stress, enhance creativity and give them the ability to focus clearly. The collection features more than 35 separate furniture pieces that have won various product-design awards.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.