Brightline Debuts Fluorescent-to-LED Conversion Kit

Video lighting systems solutions provider Brightline recently announced the debut of a retrofit package that lets users upgrade Brightline S1.2 or S1.4 fluorescent studio fixtures to LED fixtures. The conversion kit allows users to make the switch for only a quarter of the full fixture cost, according to a news release, and can help educational institutions save money on electricity costs moving forward.

The conversion process takes “just minutes,” according to the press release, and the company also provides a “How To” video that guides customers through the installation process. Brightline also offers a disposal program for the outdated fixtures, as well as a $75 refund for each unit.

“Brightline’s LED upgrade solution helps fulfill our core principle of providing the best economic and technical solutions to our partners, with minimal impact on the growing energy demands of our global environment,” said Kathy Katz, Brightline Co-Founder. “Upgrading to LED brings with it a full spectrum of benefits including reduced energy consumption, extended lifetime, lower operations and maintenance costs, and enhanced aesthetics. Brightline is proud to offer this kit which enables our video lighting partners to easily make the move to LED.”

The kit comes with “a new fixture back, front cartridge, diffusion, mounting bracket, and all necessary screws. The user merely needs to supply a Phillips screwdriver and wire cutters,” according to the press release. The new LED fixture offers improved performance, richer color saturation and standard DMX dimming controls. The new fixture is also compatible with existing accessories like mounting yokes, power cables and control screens.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.