Brightline Debuts Fluorescent-to-LED Conversion Kit

Video lighting systems solutions provider Brightline recently announced the debut of a retrofit package that lets users upgrade Brightline S1.2 or S1.4 fluorescent studio fixtures to LED fixtures. The conversion kit allows users to make the switch for only a quarter of the full fixture cost, according to a news release, and can help educational institutions save money on electricity costs moving forward.

The conversion process takes “just minutes,” according to the press release, and the company also provides a “How To” video that guides customers through the installation process. Brightline also offers a disposal program for the outdated fixtures, as well as a $75 refund for each unit.

“Brightline’s LED upgrade solution helps fulfill our core principle of providing the best economic and technical solutions to our partners, with minimal impact on the growing energy demands of our global environment,” said Kathy Katz, Brightline Co-Founder. “Upgrading to LED brings with it a full spectrum of benefits including reduced energy consumption, extended lifetime, lower operations and maintenance costs, and enhanced aesthetics. Brightline is proud to offer this kit which enables our video lighting partners to easily make the move to LED.”

The kit comes with “a new fixture back, front cartridge, diffusion, mounting bracket, and all necessary screws. The user merely needs to supply a Phillips screwdriver and wire cutters,” according to the press release. The new LED fixture offers improved performance, richer color saturation and standard DMX dimming controls. The new fixture is also compatible with existing accessories like mounting yokes, power cables and control screens.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition