Garland Company Wins Contract from Equalis Group

Roofing and building envelope solutions provider The Garland Company recently announced that it has been awarded a contract from The Cooperative Council of Governments (CCOG), an Equalis Group Lead Agency, according to a news release. Garland was awarded the publicly procured, competitively solicited contract, which is available for all Equalis members in Ohio.

“We are excited to join forces with Equalis Group to support their mission providing time savings, budget efficiencies and legal compliance to their members in our home state of Ohio,” said Alexis Turner, Director of Contracts for Garland. “The advantages leveraging the offerings from Garland/DBS as opposed to a traditional solicitation are significant and measurable, and we are able to provide a site-specific pricing process to ensure an Equalis member gets the most competitive labor pricing on every job.”

The news release reports that Equalis Group provides cooperative agreements for local, state and federal agencies including government agencies and educational institutions. These agreements help match up public institutions with the services they need; provide the institutions with better prices via the collective purchasing ability of Equalis Group Members; and saves institutions time on conducting their own search and solicitation process.

Beyond Garland’s building envelope products and solutions, the Equalis contract also includes services like inspections, design, engineering services and leak control.

“A building’s roofing and exterior, beyond keeping the interior watertight and extending the life of the building, can improve energy consumption and help with indoor air quality,” said David Akers, EVP with Equalis Group. “With all this in mind, Equalis Group is happy to connect our Ohio members with Garland, who can deliver these benefits with quality products and service.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Johns Hopkins Starts Construction on New Residence Hall, Dining Facility

    The Homewood Campus of Johns Hopkins University in Baltimore, Md., recently began construction on a new residence hall and dining facility, according to university news. The work involves demolishing the existing Alumni Memorial Residence Hall I, which was built in 1923, to make room for the new facility.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.